tower crane construction hoist building hoist mobile tower crane luffing tower crane

Home   About us     Product     Sales Network     News     Agent     Contact
Company News
Industry Information
Name : 
Category  : 
Model  :  
 

Home >> Company News

towercrane-in High-rise buildings

      Large projects with mutual influence homework more towercrane, running down to collideetc, crane tower difficult whether to continue, accurate, trouble-free operation, how to satisfy needs, reduce fault, time is of vital importance, how well the safety operation of crane?

     1) low to high tower. The low crane arm, should observe before the operation condition of high tower after operation.
     2) After the tower member let tower in two crane tower arms cross area after operation, the crane to enter the regional geological hazards in the area of the crane.
    3) dynamic tower to static tower. In the two arms crossing tower crane operating within the area in a towercrane, without turning, car arm without walking, hook,no other crane tower arm has againcar to walk, should avoid to give static dynamic towercrane.
   4) let heavy truck. Got in two crane operation, the geological hazards have no load crane tower should load.
  5) to the guest tower. With different units in actual work area, if the working area of tower crane tower arm into the work area of this unit, the aim of the area to make towercrane.

Home - About us - Sales - Recruit - Product - Honor - News - Agent - Contact- Sitemap
Zhangqiu tower crane tower crane building machinery plant  Powered by www.ce.net.cn ICP Register No.: shandong 07001410
links: tower crane ,construction hoist,Building hoist, mobile tower crane, luffing Tower Crane , concrete boom truck, tower hoist, construction lifter, construction elevator, hoists,PAA,Golf Clubs